Jökull


Jökull - 01.12.1969, Side 123

Jökull - 01.12.1969, Side 123
ministration should give consideration to more severe requirements. If comparing the IMCO recommendations 30 kg|m2 on open weather decks with the dia- grams in Fig. 3, taking the specific gravity of icing to be 0.85, the thickness of ice on decks will be 3.5 cm, which is “moderate” on the diagrams. To this should be added however tEie weight of the lateral area icing according to IMCO. It is of interest to collect more data of icing of Icelandic ships to see how they compare with these figures. It is not possible to ensure stability of a ship regardless of the amount of icing. Tlierefore further measurements are needed of the actual icing of ships at sea, to enable a decision to be taken on the reason- able amount of icing to be considered when calculating intact stability. The specific gravity of icing on a trawler was measured in Reykjavík harbour on Janu- ary 14th and 15th 1969. The ship received rather heavy icing when passing Reykjanes (Figs. 1 and 2). The rnean value of the specific gravity was found to be 0.847 (g/cm3). The measurements were carried out by cutt- ing out ice blocks of icing on different places on deck, on wire, ropes etc. These ice blocks were measured, and their volume calculated. Each block was then put in a separate glass container and the content weighted at a laboratory. The salinity was also measured, and found to vary from 9.11 to 17.39%0. METHODS TO REDUCE DANGER OF ICING OF SHIPS AND EQUIPMENT TO REMOVE ICE In order to reduce clanger of icing of ships, the following is of importance: At the design stage of a ship ice collecting items on deck should be kept at minimum. Wire rope rigging, open handrails etc. accumulate considerably more ice than tripod masts and plate bulwarks. The hull form and freeboard should be such, that sea spray is kept at a minimum, and form stability as good as possible. All super-structure should be fitted with watertight closing appli- ances on main deck. When icing starts to form on a ship, the speed and course of the ship should be sucli as to keep sea spray at minim- um, even though fishing has to be stopped. Nets, derrics, wires and other lose equipment ehould be lowered, both to reduce topweight, and to reduce icing. Freeing ports should be kept clear and open at all times. All equip- ment for removing ice should be kept ready for immediate use. It is important to keep an eye on the icing, and start removing it before is has reached any considerable weight. It is not considered adviceable to seek shelter at the edge of the sea-ice area. The icefield is not a shelter against wind, but here the air and sea temperature are very low. Shoukl the direction of the wincl change, being parallel to the ice-edge, the sea spray will increase rapidly, and the ship will then be subject to dangerous ice accumulation. Besides the ice axes and other direct mech- anical means to remove the ice by hand, several other equipment and outfit have been tested ancl will be tested which are safer and more easy to apply for removal of ice. Steam- and hotwater pipes and hoses on deck are useful to assist the mechanical removal. Electrical heating of decks, masts and super- structure makes mechanical removal of the ice also easier. By covering areas such as the front of the weelhouse with rubber or plastic material, pulsating air-pressure hoses between the flexible covering and the structure can break off the ice, if it has been permitted to form thick enough deposit to be broken but not to yield. Special paints have also been tested in order to find out if it is possible to reduce the adhesion between the structure and the ice which would make mechanical removal more easy. Doubtless further development of equipment for removal of ice will reduce the danger from icing of ships. More experience in forecasting icing with the weather forecasts, for dangerous icing-areas, will also no doubt be of great value to increase the safety of ships in north- ern waters, but today we still have to keep in mind the views expressed in the report on icing of trawlers from the British Shipbuilding Research Association: When icing conditions are encountered, the only safe protection for the ship is to withdraw from these conditions as quickly as possible. JÖKUL.L 19. ÁR 119
Side 1
Side 2
Side 3
Side 4
Side 5
Side 6
Side 7
Side 8
Side 9
Side 10
Side 11
Side 12
Side 13
Side 14
Side 15
Side 16
Side 17
Side 18
Side 19
Side 20
Side 21
Side 22
Side 23
Side 24
Side 25
Side 26
Side 27
Side 28
Side 29
Side 30
Side 31
Side 32
Side 33
Side 34
Side 35
Side 36
Side 37
Side 38
Side 39
Side 40
Side 41
Side 42
Side 43
Side 44
Side 45
Side 46
Side 47
Side 48
Side 49
Side 50
Side 51
Side 52
Side 53
Side 54
Side 55
Side 56
Side 57
Side 58
Side 59
Side 60
Side 61
Side 62
Side 63
Side 64
Side 65
Side 66
Side 67
Side 68
Side 69
Side 70
Side 71
Side 72
Side 73
Side 74
Side 75
Side 76
Side 77
Side 78
Side 79
Side 80
Side 81
Side 82
Side 83
Side 84
Side 85
Side 86
Side 87
Side 88
Side 89
Side 90
Side 91
Side 92
Side 93
Side 94
Side 95
Side 96
Side 97
Side 98
Side 99
Side 100
Side 101
Side 102
Side 103
Side 104
Side 105
Side 106
Side 107
Side 108
Side 109
Side 110
Side 111
Side 112
Side 113
Side 114
Side 115
Side 116
Side 117
Side 118
Side 119
Side 120
Side 121
Side 122
Side 123
Side 124
Side 125
Side 126
Side 127
Side 128
Side 129
Side 130
Side 131
Side 132
Side 133
Side 134
Side 135
Side 136
Side 137
Side 138
Side 139
Side 140
Side 141
Side 142
Side 143
Side 144
Side 145
Side 146
Side 147
Side 148
Side 149
Side 150
Side 151
Side 152
Side 153
Side 154
Side 155
Side 156
Side 157
Side 158
Side 159
Side 160
Side 161
Side 162
Side 163
Side 164
Side 165
Side 166

x

Jökull

Direkte link

Hvis du vil linke til denne avis/magasin, skal du bruge disse links:

Link til denne avis/magasin: Jökull
https://timarit.is/publication/1155

Link til dette eksemplar:

Link til denne side:

Link til denne artikel:

Venligst ikke link direkte til billeder eller PDfs på Timarit.is, da sådanne webadresser kan ændres uden advarsel. Brug venligst de angivne webadresser for at linke til sitet.