Jökull


Jökull - 01.12.1994, Page 23

Jökull - 01.12.1994, Page 23
between the L1 and L2 ambiguities), fixing the point coordinates to the values calculated earlier. In the final stage, the coordinates of the points and the L1 and L2 ambiguities were calculated using the L3, ionosphere- free phase combination and the L5 ambiguities obtain- ed earlier. These final results are the L3 ambiguity- fixed solutions, called so because they are calculated holding the L1 and L2 ambiguities fixed at integer val- ues. In addition to coordinates, the formal (standard) errors associated with each point coordinate for each individual measurement are calculated from the phase data scatter. In this paper we adopt the traditional, geodetic definitions of measures of the quality of our measurements (which may differ to some, more recent usage of the terms e.g., Larson and Agnew, 1991), and term these errors the precision of the results. Since the sessions were often over 8 hours long they were split into two and each part processed sepa- rately. A different ionospheric model was used for each half. The final coordinates were calculated by performing a network adjustment using the program NETADJ (Heki, 1992). This program solves for the set of coordinates that minimises the weighted RMS difference between them and those calculated for the individual sessions. The weighted RMS scatter of the measurements for each coordinate about the mean value defines the repeatability of the coordinate re- sults (Larson and Agnew, 1991). The repeatability can, within one survey, give an idea, though not a pre- cise evaluation, of the accuracy of that survey, i.e., how close the results are to the truth. Point Núpafjall was held fixed so the errors we calculate correspond to the positions of each point rel- ative to Núpafjall. The formal errors in the individual Observation Date, August 1991 Point 10 11 13 14 15 16 18 20 21 22 23 24 25 26 27 OS-7134 * * * * ******* * * * * DU01 DU02 * * * DU03 DU04 * * * DU06 DU07 DU08 DU13 * * * * * DU15 * DU16 DU17 * * DU18 * DU20 * DU21 * DU22 * DU25 * DU26 * DU27 * DU28 * DU30 * NE-79-037 * OS-1985-7331 * S027 * S001 * S061 * S056 * Table 1 Point occupation schedule for the Hengill survey, 10-27 August 1991. 1. tafla. Dagatal staðsetningarmœlinga í öllum stöðvum á Hengilssvæðinu. JÖKULL, No. 44 21

x

Jökull

Direct Links

If you want to link to this newspaper/magazine, please use these links:

Link to this newspaper/magazine: Jökull
https://timarit.is/publication/1155

Link to this issue:

Link to this page:

Link to this article:

Please do not link directly to images or PDFs on Timarit.is as such URLs may change without warning. Please use the URLs provided above for linking to the website.