Jökull

Ataaseq assigiiaat ilaat

Jökull - 01.12.1968, Qupperneq 34

Jökull - 01.12.1968, Qupperneq 34
tion between the size of the open waters and meteorological and hydrological factors. The most important parameters seem to be the heat loss and the river discharge. Direct observations of the rate of heat loss from rivers are very limited as yet. We have considered three methods for such observations. With the first method the mass of ice in an ice jam is compared to calculated ice produc- tion. In 1965 the volume of an ice jam below Thjofafoss Falls (Burfell ice jam) in Thjorsa River was determined with photogrammetric methods on Febr. 23 and March 27. The in- crease in ice volume during this period was 19 ± 1 million cubic metres. The mean water equivalent of the ice jam is not known but on the surface it was 0.5—0.6. The measured in- crease in volume occurred in the period March 18—27 and there was no discharge of ice from the downstream end of the jam in this period. The total discharge of the river was 124 million cubic metres March 18—27. The calculated total ice production in the open water area upstream from the jam during this period was 15 million metric tons and it is estimated that about 13 million tons reached the jam. To bring this into agreement with the measured increase in volume the mean water equivalent of the jam must be 0.65—0.72 which is rather high but not quite unreasonable as the major part of the jam is dry and the thickness up to 15 metres. With the second method the river tempera- ture is measured in successive sections when the river is in a state of cooling and the heat loss is calculated from equation (18). This method has been tried in Thjorsa River but has not been sucessful as yet. The diffi- culties arise from the fact that there are com- paratively great temperature differences in the same cross section and there are some practical obstacles to obtain cross-sectional means. The Thjorsa River is wide and shallow where the temperature measurements were made and the temperature changes in these reaches can be very rapid as is seen from the following example from Oct. 13—14 1967. The river width is about 400 m and the depth 0.5 m, almost even in a reach of several kilometres. The discharge was 177 m3 sec-1. 368 JÖKULL 18. ÁR Time ‘w N vo ew ea hours °C 0-8 °C m sec-1 mb mb 18 1.09 1.0 1.5 11.5 6.7 5.3 19 0.98 1.2 1.1 10.9 6.5 5.2 20 0.81 2.0 0.9 12.9 6.4 5.0 21 0.60 2.7 0.8 11.9 6.3 5.0 22 0.38 2.3 0.6 12.8 6.2 5.0 23 0.17 1.3 0.2 12.6 6.1 4.8 24 0.0 1.0 -0.1 11.7 6.1 4.5 01 0.0 Here N, ta, V6, ew and ea are hourly means. The water temperature was zero at 2350 hours. It is interesting that in this example the air temperature is a little higher than the water temperature and accordingly there is a slight heat gain by convection but the heat loss by radiation and evaporation is many times higher. The water was slightly supercooled (tw rz -^0.01 °C) at about the same time as the air tempera- ture was down to 0 °C and frazil ice produc- tion had started. The third method consists in measuring the frazil ice discharge in successive sections of the river and obtain the heat loss from the open water area from the increase in frazil ice dis- charge. This would be the most rational ap- proach where the heat loss formulas are used for calculations of ice production as it is likely that the heat loss is affected by clusters of frazil ice floating on the surface. An ice dis- charge gauge based on the fact that the elec- trical conductivity of the ice-water mixture is a function of the ratio between ice volume and total volume of the mixture has been constructed by Mr. Björn Kristinsson, Elec- tronics, Reykjavik, but it has been on the ex- perimental stage up to now. CONCLUDING REMARKS Calculations of heat loss from a river sur- face and frazil ice production on the basis of meteorological observations are possible, pro-
Qupperneq 1
Qupperneq 2
Qupperneq 3
Qupperneq 4
Qupperneq 5
Qupperneq 6
Qupperneq 7
Qupperneq 8
Qupperneq 9
Qupperneq 10
Qupperneq 11
Qupperneq 12
Qupperneq 13
Qupperneq 14
Qupperneq 15
Qupperneq 16
Qupperneq 17
Qupperneq 18
Qupperneq 19
Qupperneq 20
Qupperneq 21
Qupperneq 22
Qupperneq 23
Qupperneq 24
Qupperneq 25
Qupperneq 26
Qupperneq 27
Qupperneq 28
Qupperneq 29
Qupperneq 30
Qupperneq 31
Qupperneq 32
Qupperneq 33
Qupperneq 34
Qupperneq 35
Qupperneq 36
Qupperneq 37
Qupperneq 38
Qupperneq 39
Qupperneq 40
Qupperneq 41
Qupperneq 42
Qupperneq 43
Qupperneq 44
Qupperneq 45
Qupperneq 46
Qupperneq 47
Qupperneq 48
Qupperneq 49
Qupperneq 50
Qupperneq 51
Qupperneq 52
Qupperneq 53
Qupperneq 54
Qupperneq 55
Qupperneq 56
Qupperneq 57
Qupperneq 58
Qupperneq 59
Qupperneq 60
Qupperneq 61
Qupperneq 62
Qupperneq 63
Qupperneq 64
Qupperneq 65
Qupperneq 66
Qupperneq 67
Qupperneq 68
Qupperneq 69
Qupperneq 70
Qupperneq 71
Qupperneq 72
Qupperneq 73
Qupperneq 74
Qupperneq 75
Qupperneq 76
Qupperneq 77
Qupperneq 78
Qupperneq 79
Qupperneq 80
Qupperneq 81
Qupperneq 82
Qupperneq 83
Qupperneq 84

x

Jökull

Direct Links

Hvis du vil linke til denne avis/magasin, skal du bruge disse links:

Link til denne avis/magasin: Jökull
https://timarit.is/publication/1155

Link til dette eksemplar:

Link til denne side:

Link til denne artikel:

Venligst ikke link direkte til billeder eller PDfs på Timarit.is, da sådanne webadresser kan ændres uden advarsel. Brug venligst de angivne webadresser for at linke til sitet.