Jökull


Jökull - 01.12.2007, Side 74

Jökull - 01.12.2007, Side 74
Thorsteinsson et al. measured and samples for a geochemical study ob- tained (Ágústsdóttir and Brantley, 1994). In 2002, the lake was sampled for microbiological investigations for the first time, with positive results (Gaidos et al., 2004) but with the exception of heating the drilling fluid to high temperature, these projects did not in- corporate the techniques intended to decontaminate the drilling water described here. The development of methods for drilling and sampling that minimize the probability of contamination is of particular inter- est for future exploration of the physical, geochemical and biological properties of Antarctic subglacial lakes (Fard, 2002; Priscu and Christner, 2004; Siegert et al., 2001). Close to 150 subglacial lakes are now known to exist beneath the Antarctic Ice Sheet (Siegert et al., 2005), but none of them have yet been directly sam- pled due to their remote locations, the technical chal- lenge of penetrating 1–4 km of ice in a polar envi- ronment, and concerns about contamination from the surface. A HOT WATER DRILLING SYSTEM THAT INCORPORATES IN-LINE STERILIZATION A hot water drilling system has been designed and built at the Hydrological Service Division of the Na- tional Energy Authority (Orkustofnun), Iceland. The main components of this system are shown in Figure 1 and specified further in Table 1. Photos of individ- ual parts and field operations are shown in Figure 2. Snow is melted in a 600 l plastic tube in which a heat exchanger is placed. Glycol is heated in a combustion unit (diesel burner) and circulated in a closed loop system between the burner and the heat exchanger. The closed loop system is fitted with an expansion chamber and has a total length of 35 m. The melt- water is pumped from the plastic tub through twin fil- ters (pore size: 50 µm) to remove large particulates and then through a UV sterilization unit before en- tering the combined high pressure pump and heater Figure 1. Schematic diagram of the hot water drilling system. See Table 1 for specific information on the individual parts. – Skýringarmynd af bræðslubornum. Einstakir hlutar borkerfis eru tíundaðir í töflu 1. 72 JÖKULL No. 57
Side 1
Side 2
Side 3
Side 4
Side 5
Side 6
Side 7
Side 8
Side 9
Side 10
Side 11
Side 12
Side 13
Side 14
Side 15
Side 16
Side 17
Side 18
Side 19
Side 20
Side 21
Side 22
Side 23
Side 24
Side 25
Side 26
Side 27
Side 28
Side 29
Side 30
Side 31
Side 32
Side 33
Side 34
Side 35
Side 36
Side 37
Side 38
Side 39
Side 40
Side 41
Side 42
Side 43
Side 44
Side 45
Side 46
Side 47
Side 48
Side 49
Side 50
Side 51
Side 52
Side 53
Side 54
Side 55
Side 56
Side 57
Side 58
Side 59
Side 60
Side 61
Side 62
Side 63
Side 64
Side 65
Side 66
Side 67
Side 68
Side 69
Side 70
Side 71
Side 72
Side 73
Side 74
Side 75
Side 76
Side 77
Side 78
Side 79
Side 80
Side 81
Side 82
Side 83
Side 84
Side 85
Side 86
Side 87
Side 88
Side 89
Side 90
Side 91
Side 92
Side 93
Side 94
Side 95
Side 96
Side 97
Side 98
Side 99
Side 100
Side 101
Side 102
Side 103
Side 104
Side 105
Side 106
Side 107
Side 108
Side 109
Side 110
Side 111
Side 112
Side 113
Side 114
Side 115
Side 116
Side 117
Side 118
Side 119
Side 120
Side 121
Side 122
Side 123
Side 124

x

Jökull

Direkte link

Hvis du vil linke til denne avis/magasin, skal du bruge disse links:

Link til denne avis/magasin: Jökull
https://timarit.is/publication/1155

Link til dette eksemplar:

Link til denne side:

Link til denne artikel:

Venligst ikke link direkte til billeder eller PDfs på Timarit.is, da sådanne webadresser kan ændres uden advarsel. Brug venligst de angivne webadresser for at linke til sitet.