Jökull


Jökull - 01.12.2007, Page 79

Jökull - 01.12.2007, Page 79
A hot water drill with built-in sterilization Table 3. Tests of hot water drilling system at NEA building on March 8 and May 22 2006. Numbers indicate cells per ml. S1–S4 refer to the sampling outlets on Figure 1. – Niðurstöður prófana á borkerfi vorið 2006. Sample description Colony forming Colony forming Colony forming units in 1 ml on PCA agar units in 1 ml on PCA agar units in 1 ml on Endo agar 22!C 3!C 37!C NEA Test 1 NEA Test 2 NEA Test 1 NEA Test 2 March 8 May 22 Snow Tap water with Snow Tap water Snow E. coli spike Snowmelter 46 72 0 3.2 x 104 S1 – before filtering 900 173 0 3.2 x 104 S2 – after filtering 781 171 0 3.2 x 104 S3 – after UV 120 94 0 19 S4 – from high-pressure pump before hose (99!C) 0 0 0 0 From drill stem(99!C) –1 0 0 0 0 From drill stem(99!C) –2 0 0 0 0 Mn, Cr, Ni and V. These metals are typically found to be associated with pollution from stainless steel, rub- ber and rubber o-rings. Borehole diameter estimates Hot-water drilled boreholes are commonly used in glaciology for the deployment of instruments that measure temperature, basal water pressure, hole incli- nation and other parameters relevant for ice flow stud- ies. Videocameras have also been used to study the glacier bed (Engelhardt et al., 1978; Pohjola, 1993) and autonomous mini-submarines equipped with a camera, various sensors and a sampling system, that could be used in future studies of subglacial lakes, are being developed (Lane et al., 2005; Jonsson, 2006). Accurate knowledge of the expected (minimum) bore- hole diameter is of importance for the optimum de- sign of such instruments. No measurements of hole diameter were carried out during the test drillings on Langjökull, but the rate of ice melting at hole bottom, and thus the borehole width, may be estimated from thermodynamic considerations, using the surface tem- perature of the drilling water, the drilling rate and the mass flow rate through the drill stem. See Appendix 1 for derivation of the formulas used. Figure 4 shows the calculated decrease in drilling water temperature with depth due to heat loss through the hose, between the surface and 600 m depth in tem- perate ice (at the melting point throughout). A mass flow rate of 450 l/hr and a surface temperature of 90 !C are assumed and the presence of a 10–30 m thick firn layer at the top is neglected. The model predicts that the temperature has dropped to 64!C after drilling through 100 m of ice and to 33!C at 300 m depth; the typical ice-cover thickness above subglacial lakes in the Vatnajökull ice cap. Figure 5 shows the cal- culated borehole diameter for three different values of the drilling speed, down to a depth of 600 m, the maximum depth attainable with the present version of the drill. Because of the decrease of temperature with depth, less energy is available for ice melting as the depth increases and thus the diameter decreases. The diagram depicts the hole diameter immediately after the passage of the drill tip, but since the heat lost from the hose must be used for additional melting of the hole walls higher up the borehole, the hole will subsequently become wider depending on how much further the drill penetrates. Moreover, heat may be lost from the bottom via hot water rising in a buoy- ant plume in the borehole; this will also contribute to melting of the hole walls. JÖKULL No. 57 77
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18
Page 19
Page 20
Page 21
Page 22
Page 23
Page 24
Page 25
Page 26
Page 27
Page 28
Page 29
Page 30
Page 31
Page 32
Page 33
Page 34
Page 35
Page 36
Page 37
Page 38
Page 39
Page 40
Page 41
Page 42
Page 43
Page 44
Page 45
Page 46
Page 47
Page 48
Page 49
Page 50
Page 51
Page 52
Page 53
Page 54
Page 55
Page 56
Page 57
Page 58
Page 59
Page 60
Page 61
Page 62
Page 63
Page 64
Page 65
Page 66
Page 67
Page 68
Page 69
Page 70
Page 71
Page 72
Page 73
Page 74
Page 75
Page 76
Page 77
Page 78
Page 79
Page 80
Page 81
Page 82
Page 83
Page 84
Page 85
Page 86
Page 87
Page 88
Page 89
Page 90
Page 91
Page 92
Page 93
Page 94
Page 95
Page 96
Page 97
Page 98
Page 99
Page 100
Page 101
Page 102
Page 103
Page 104
Page 105
Page 106
Page 107
Page 108
Page 109
Page 110
Page 111
Page 112
Page 113
Page 114
Page 115
Page 116
Page 117
Page 118
Page 119
Page 120
Page 121
Page 122
Page 123
Page 124

x

Jökull

Direct Links

If you want to link to this newspaper/magazine, please use these links:

Link to this newspaper/magazine: Jökull
https://timarit.is/publication/1155

Link to this issue:

Link to this page:

Link to this article:

Please do not link directly to images or PDFs on Timarit.is as such URLs may change without warning. Please use the URLs provided above for linking to the website.